Campus Master Plan - Financial Summary

Campus Master Plan

RENOVATION BUDGETS

Renovations recommended have been organized in 4 categories.

  • Minor: Aesthetic repairs only – new carpet, ceiling tiles, paint finish, new light fixtures. No structural, roofing or exterior wall work in included.
  • Moderate: Renovation of 50% of the building area including demolition of existing partitions and MEP distribtuion devices, installation of new HVAC devices, no new front-end equipment or distribution systems, no structural changes, no roofing, no substantial exterior wall work.
  • Major: Complete renovation including demolition of existing partitions and MEP distribution systems and devices, and installation of new, no new front-end equipment, minor structural, no roofing, minor exterior wall work.
  • Demolition: Complete demoltion of building, replaced with grass

The first three categories may be further classified as a Realignment Renovation. This designation indicates that the renovation, whether minor, moderate, or major, is the Based on these categories, construction cost budgets are given below. The budget estimates are made in 2004 Dollars. Historically, annual construction costs escalate at a rate of approximately 6%. Therefore, an escalation factor of 6% should be added for each year until the renovation is performed.

BUILDING Renovation Classifiction Area TOTAL BUDGET COST
ART BUILDING Minor 27,990 $1,083,213
BROOKS-SHIVERS HALL 1/2 Major
1/2 Demolis
129,990 $8,690,310
COMMUNICATION BUILDING Major 11,231 $717,660
EARLY CHILDHOOD DEVELOPMENT CNTR Demolition 12,812 $107,620
EARLY CHILDHOOD DEV CTR ANNEX Demolition 6,100 $51,240
BIOLOGY BUILDING Moderate 33,880 $1,748,208
JOHN GRAY INSTITUTE – A & B Minor 19,162+
23,530
$1,955,717
JOHN GRAY INSTITUTE - C Moderate – Realignment 2,000 $150,000
HUMAN RESOURCES Demolition 3,005 $25,242
MAIN DINING HALL Major – Realignment 31,063 $2,627,248
MUSIC BUILDING Major 26,072 $1,666,000
PLUMMER ADMINISTRATION BLDG Moderate 15,105 $779,418
PHYSICAL PLANT Demolition 30,000 $240,000
GRAY LIBRARY Minor 174,415 $3,488,300
MONTAGNE CENTER Moderate 145,496 $7,507,593
ROTC BUILDING Demolition 8,457 $71,038
SCIENCE AUDITORIUM Moderate 4,470 $257,472
SETZER STUDENT CENTER Minor 110,607 $4,280,490
THEATRE Major 17,400 $1,780,020
TRACK UTILITY BLDG. Major 761 $48,627
MCDONALD GYM AND STUDENT REC Major - Realignment   $15,000,000
VINCENT-BECK BASEBALL STADIUM Moderate   $4,250,000
WOMEN’S HEALTH & PE Moderate 43,689 $2,516,486
CARDINAL STADIUM AND FIELDHOUSE Major   $10,000,000
GOLF DRIVING RANGE Minor   $300,000
 
 
Lamar University Logo - Home Button ©1996 - 2008, Lamar University. All Rights Reserved.
A Member of The Texas State University System
Accreditation Statement
Last Revised: 10/8/2008
Accessibility Policy
Privacy and Security Policy
Texas Homeland Security

General Info: (409) 880-7011
4400 MLK Blvd., P.O. Box 10009, Beaumont, Texas 77710
Compact with Texans
Texas Comptroller
Request Information Online
State of Texas
Statewide Information Search(Trail)
Governor's Committee on People with Disabilities